Project Update

The project consists of the pulverization of existing asphalt roadway along Country Park Drive, Robbie Lane, Pine Cove Road, and Woodland Hills Road. The existing deteriorated asphalt will be pulverized in place, re-graded, and new asphalt will be installed. Existing drainage issues will be addressed during the project. The repair of guard rail and posts along the roadway is needed. The adjustments of utilities to bring up to new road grade will be necessary.

Skip to content