The project generally consists of pulverizing and blending in place the existing asphalt pavement surface, base preparation of recycled base material and placement of new asphalt concrete at various locations throughout the City. The work also includes pavement repairs, the adjustment of utility covers to finish grade and the restoration of disturbed traffic striping. Please see the attached update for locations.