The project generally consists of milling existing asphalt pavement, performing base preparation, and placing new asphalt pavement. The work includes repair on unsuitable subgrade on an as needed basis, the adjustment of utility covers to finish grade, and the restoration of disturbed traffic striping. The project may also include curb and gutter replacements as necessary. The first phase of the project will be constructed in the early Fall of 2021 and will include Wilkinson Drive from the Prescott Regional Airport, south to the new Corsair Drive roundabout intersection.