Project Update

The project consists of the removal and replacement of deteriorated asphalt at four locations:
Whipple Place, Rosewood Circle, Forbis Street, and Ainsworth Drive.

Work on Rosewood Circle will include the replacement of sections of curb and sidewalk that have settled and now create hazards to the public.
Work on Whipple Place: remove and replace the deteriorated asphalt, add roll curb where needed, and install a valley gutter at 109 Whipple Place to allow water to cross the roadway, and the possible replacement of a 75-foot section of sewer line.
Work on Forbis Street will include drainage redesign and replacement of deteriorated asphalt, subgrade, and curb repairs as needed.
On Ainsworth Drive, work will include the removal and replacement of deteriorated asphalt.

Skip to content