The project consists of the replacement of chipseal over millings roads with new asphalt at multiple locations. The roadway width should be maintained where possible; if the roadway is under 20 feet wide, Staff will determine if it is possible to widen the roadway. Some of the roads are one way in and one way out. Drainage on all road will be analyzed on a road-by-road basis, as they are all are a little different. Utility Adjustments for construction will be needed.