The project generally consists of drainage improvements within a city drainage easement
located between Lakeview Drive and Mines Pass. This work includes a new underground
storm drainpipe along with an open Rip Rap channel surface to provide erosion protection
and to carry stormwater runoff to an existing drop inlet at Mines Pass.
The engineering consultant, JE Fuller, has designed underground stormwater piping
conveyance structure in addition to open-channel surface improvements. This project is
anticipated to start in late May.