The project generally consists of roadway and utility trench improvements along Pleasant Street between Carleton Street and Aubrey Street. The primary scope of work is to repair excessive settling along utility trenches that has created uneven pavement and unsafe driving conditions.
Work includes the removal and replacement of the utility trench backfill material, damaged concrete curb and gutter, asphalt pavement, and utility adjustments with new concrete collars for protection.