The City’s Streets Maintenance Division will be incrementally relocating their operations to vacated portions of the Sundog Wastewater Treatment Plant as portions of the plant are decommissioned. The first phase of the project involved demolishing four decommissioned, concrete sludge beds and back filling them with crushed miscellaneous base material to create a pad for a future building at the site.
The first phase of construction will likely involve construction of a concrete slab on grade and the installation of new spreader racks for the storage of the City’s snow removal equipment. The design shall be such that a building can be constructed in a subsequent phase to enclose the spreader racks and other snow removal equipment and materials and protect City employees from inclement weather while gearing up for snow removal.