The project will consist of relocating the existing Zone 7 pump station that feeds pressure zones east of Prescott Lakes Parkway, eastward to the new 1.5 MG water storage tank for pressure Zone 56, and relocated and upgraded to meet existing and future domestic and fire flow demands for this area. The project will include installation of new pumps, associated controls and appurtenances, and an above-ground building enclosure. This project will be constructed concurrent with the installation of the new Zone 56 1.5 MG tank and piping.