Skip to content

Project Update

The project generally consists of removing two existing 200,000 gallon water storage tanks and replacing with a single 750,000 gallon water storage tank.  The project includes replacing the existing Mingus Pump Station to meet demands and upsize the pipeline between the pump station and the new tank.